NorthWest Response & Environmental Consulting

Constructed Wetlands

  • 2008 & 2011 Designed and constructed surface water collection (retention pond) and wetland treatment systems to treat wood waste leachate (resin acids) in surface water runoff at sawmills.
  • 2017 Construct an anaerobic wetland (pilot project) to treat sulphates in water discharge from tailings pond.
  • 20 years of Water Quality Monitoring including
      • Annual water quality monitoring and reports for Effluent Discharge Permits
      • 2 year study (2013-2014) to verify effectiveness of constructed wetlands to treat leachate
      • 4 year study (2012-2015) to verify effectiveness of constructed wetlands to treat leachate and kiln condensate
  • Groundwater and Surface Water Characterization
      • Wood waste landfill monitoring wells
      • Permit discharge monitoring programs
  • Effluent Discharge Permit Application Process:
      • Technical Report
      • Monitoring Requirements
      • Consultation Requirements
      • Impact Assessment